SMC and SME series Medium Voltage Switchgears had been used for Isparta Integrated Health Campus which is one of the first constructed integrated health campus projects.  Project has been constructed by Akfen Holding and Local Authority partnership and has 755 bed space, 18 operating room, 204 policlinic, car park with 2.262 car capacity and 112 emergency helicopter ambulance control centre on ...
Please, click here for more...
SMS-2 series 33/11kV, 16MVA Mobile Substation has been given in to Ministry of Electricity Iraq (Moe) for Salahdeen Electricity Directorate within United Nations Development Programme (UNDP). Besides conformity of tender specification, design, engineering calculations, and production were performed by Aktif’s experienced R&D, design and production team in order to get maximum safety and maximum ...
Please, click here for more...
Aktif is the first local manufacturer in Turkey which has seismic tests.We would like to inform you that following type of high-voltage AC switchgear and controlgear,SNC type, 12 kV, 31,5 kA. Metal-Clad SwitchgearSME type, 36 kV, 16 kA. Metal Enclosed SwitchgearWhich have been producing since 1981 in compliance with TS EN 62271-200, at the manufacturing plant of AKTİF ELKTROTEKNİK A.Ş, located in Ankara, ...
Please, click here for more...
41 Burda Mall Project which is finished by ESAS Holding and STFA Investment Holding partnership, started to give enjoy and new life style to people of Kocaeli.The start up of Automatic Meter Reading System (AMR) of 41 Burda Mall’s 196 stores was finished in short time like 3 days and the system was started to run.With SCADA integration process, in the project which is remote load control featured energy ...
Please, click here for more...
Chamber of Ankara Industrial 1. (Sincan) Industrial Zone will continue to Aktif muhendislik products and complete system results as 10 years according to new energy market’s requirements. Even there are a lot of companies in decision time line, with our last technological energy meters, professional engineer team and multifunctional ActwinSmart Software which can be customized according to requirements ...
Please, click here for more...
Aktif Mühendislik designed and manufactured the Reactive Power Compensation System of 19 km Railway Line of the Square-Airport-Expo Aksu Project which was announced by Antalya Metropolitan Municipality. The first stage of the Project was completed in 2008 with Aktif Mühendislik products. Reactive Power Compensation System has been running successfully for the past eight years and End-User has not condemned ...
Please, click here for more...
The railway system constructed for access to EXPO was introduced during the opening ceremony held in Antalya. Antalya Metropolitan Municipality has constructed 19 kilometers long rail system for access to EXPO 2016 area in a very short period of 5 months with the support of Ministry of Transportation. Aktif Group has the main role in construction of all Traction Power systems and switching equipments ...
Please, click here for more...
The plants where to have nonlinear loads have some power quality problems about reactive power compensation and harmonic. Medium Voltage Power Compensation and Harmonic Filter applications are power quality solution that need to be used this plants and solve this problems. In this way this issues is not problem to work plants and factories after this solutions.1.2 MVAr 30 kV(0.54 MVAr 20 kV) 5th Harmonic ...
Please, click here for more...
Odayeri Landfill Gas Power Plant which is built by Istanbul Metropolitan Municipality and is named as the largest landfill power plant in Europe and one of the ten largest landfill power plants in the world had been put into served with participation of President and Metropolitan Municipality Mayor.Odayeri Landfill area where has been collected waste since 1995 has 52 hectare area and 32 million tone ...
Please, click here for more...
Akçakoyun HEPP in Osmaniye city had been put into service on 16 of August, 2015. It is being targeted to provide daily electricity requirement of 4870 people with Akçakoyun HEPP which has annually 16GW Energy generation capacity.2 pcs 36/√3 kV, 1000 A, 20 Ohm and 7.2/√3 kV, 10 A, 364 Ohm SRG series neutral grounding resistor were produced by Aktif Elektroteknik A.Ş.
Please, click here for more...