Project

Acıbadem Altunizade Hospital Insulated Power System

Categories

Medical Facility,

Status

Completed

Client

Acıbadem Altunizade Hospital

Description

Acıbadem Altunizade Hospital which is continuing in Altunizade, Istanbul, has 95.000 m2 closed area and 17.000 m2 land area. The design and construction of a fully equipped hospital with 250 bed capacity aimed to be completed by the beginning of 2017 is being carried out by the Acıbadem Group and the project is a candidate for the Gold certification in the LEED Healthcare category.

EXPECTATION

Technical management of the Acıbadem Altunizade hospital requested that the operating theatre rooms, premature baby rooms and intensive care rooms which are covered by Group 2 rooms are supplied from the IT system. At the same time the Integrated Power Panels with fault location system will be integrated and the reports from these Panels will be monitored by Central Alarm Panels. And its requested that to determine the information of which fault occurred in which area and to monitor this information on SCADA.

APPLICATION

All of the Group2 rooms in Acıbadem Altunizade hospital are planned to be supplied with Bender Isolated power systems via IT system. By taking measures against electrical faults and interruptions, the safety of patients, personnel and electrical equipment will be ensured.

RESULT

All the rooms evaluated in the scope of Group 2 rooms such as Operating Room, Premature Baby Rooms and Intensive Care Unit in Acıbadem Altunizade Hospital will be supplied from the Isolated Power System and all isolation power systems will be controlled by Bender Insulation monitoring devices and fault location system to detect all possible insulation faults and transmission of the detected insulation faults to the related technical units via audio and visual warning panels and TCP / IP Ethernet to the converter, faults can be easily read from the SCADA and automation screens.

 

×
img