Project

Water Intake and Injection Facility project

Categories

Energy and Infrastructure,

Status

Succeed

Client

Torto Company

Description

12 units SNC series 12kV, 1250A, 31.5kA/3s and 28 units SNC series 12kV, 630A, 31.5kA/3s metal clad switchgears for the Water Intake and Injection Facility project of end user KAR FZE Construction and Engineering and contractor Torto Company in Iraq, it has been designed and manufactured and all tests have been successfully passed.

Maximum safety was ensured in the project, which was meticulously carried out by Aktif Elektroteknik’s experienced R&D and production team.

In the Iraq sector, where product shipments have been carried out intensively for many years, our metal clad switchgears were also appreciated and customer satisfaction was again achieved.

 

×
img

Quick Quote Request

Share your contact and request details. Our team will review your requirements and contact you with the most suitable solution.

Takes about 1 minute
Select your country code and enter your phone number without the leading zero.
Example: We are looking for a medium-voltage distribution solution for a new solar power plant project.
Optional. Accepted formats: PDF, DOC, DOCX, XLS, XLSX, JPG and PNG. Maximum file size: 10 MB.