Project

Insulated Power Panels of 2. Phase Acibadem Maslak Hospital

Categories

Medical Facility,

Status

Completed

Client

Acibadem Maslak Hospital

Description

Acıbadem Maslak Hospital, which has a closed area of 40.000 m2, has 210 beds, 27 intensive care beds and 15 operating theaters. The second stage, which is a continuation of the hospital project in Maslak, consists of 3 main blocks, 6 operating theaters and 20 intensive care beds.

In the main hospital, such as the Operating Room, Intensive Care, Premature Infant Rooms were equipped with isolated power systems supplied by Aktif Engineering via supply IT system. Additionaly in the new stage of the Maslak Hospital project, Acıbadem’s preferred Bender products were used as Aktif Brand Medical Isolated Power Panels.

×
img