Project

Commissioning of Kayseri Integrated Health Campus

Categories

Medical Facility,

Status

Completed

Client

Kayseri Integrated Health Campus

Description

Aktif brand Isolated Power Systems and Operating Theatre Control Panels were commissioned by Aktif in Kayseri Integrated Health Campus project which has a closed area of approximately 385.000m2 and an open area of 800.000m2, has been installed with a capacity of 1584 beds.

Bender insulation monitoring device, fault location system and alarm indicator panels were used in conjunction with 189 pieces Isolated Power Panel with 44 pieces OCP-10 operating theatre control panels are fully commissioned and technical staff were provided in the required trainings.

×
img

Quick Quote Request

Share your contact and request details. Our team will review your requirements and contact you with the most suitable solution.

Takes about 1 minute
Select your country code and enter your phone number without the leading zero.
Example: We are looking for a medium-voltage distribution solution for a new solar power plant project.
Optional. Accepted formats: PDF, DOC, DOCX, XLS, XLSX, JPG and PNG. Maximum file size: 10 MB.