Aktif Muhendislik Signature on Jakarta LRT Tramway Project
Jakarta LRT (Jakarta Light Rail Transit) is a light metro system that currently is under construction in Jakarta, the capital […]
Insulated Power Panels of 2. Phase Acibadem Maslak Hospital
Acıbadem Maslak Hospital, which has a closed area of 40.000 m2, has 210 beds, 27 intensive care beds and 15 […]
FAT for IT Panels of Ankara Etlik Integrated Health Campus
Not only in Turkey, the world’s largest hospital is located between Ankara Etlik Integrated Health Campus has also started construction […]
Isparta Industrial Zone chose to Aktif Mühendislik for AMR System
The Isparta Organized Industrial Zone, the center point where the industrial zone of the region, preferred Actwin Smart Meter Automation […]
Commissioning of Kayseri Integrated Health Campus
Aktif brand Isolated Power Systems and Operating Theatre Control Panels were commissioned by Aktif in Kayseri Integrated Health Campus project […]
Aktif Mobile Substations Are Taking The Road For Ministry of Electricity Iraq!
7 set 132/33 kV, 31.5 MVA ve 3 set 132/11 kV 25 MVA Mobile Substation has been delivered to Ministry […]
The Commissioning Of The First Rooftop Solar Power Plant Which Used Modular Centralized Inverter Has Been Done.
One of the most important legumes companies of Turkey, Yayla Gıda, it was lead the way in the roof top […]
Factory Acceptance Test of Metro Group’s 9.75 MW Inverters is Completed
Metro Group chose FRIEM RST Solar Transformer Substations for their own unlicensed investments in 9.75 MWe power plants. Solar Power […]
Afyon Kocatepe University 180 Beds Oncology and Hematology Hospital Choosed Aktif in Medical Isolating Transformer Power Systems
Aktif-branded Medical Isolated Power Systems and Operating Control Panels preferred for AKÜ 180 Beds Oncology and Hematology Hospital which will […]