Description

1587-bed Kayseri Integrated Health Campus is going to be completed by PPP business model. It’s construction and operating periods are 3 years and 25 years respectively. Kayseri Integrated Health Campus will have an indoor area of 464.000 m2 and is built on a 750.000 m2 area in total.
Within the scope of the project, a large number of Active brands are equipped with an Isolated Power Panel with Error Detection System and an Operating Room Control Panel.
