Description
Aktif brand Isolated Power Systems and Operating Theatre Control Panels were commissioned by Aktif in Kayseri Integrated Health Campus project which has a closed area of approximately 385.000m2 and an open area of 800.000m2, has been installed with a capacity of 1584 beds.
Bender insulation monitoring device, fault location system and alarm indicator panels were used in conjunction with 189 pieces Isolated Power Panel with 44 pieces OCP-10 operating theatre control panels are fully commissioned and technical staff were provided in the required trainings.